K-D Electric

Restaurants

Chick-fil-A Braker Lane

Our scope of work will be the construction of a Parallel Drive Thru Cockpit (PDC), kitchen modifications, Fresh updates to the front of house areas and limited site construction. Our construction start date 3/20/26, with overall completion of all scope of work on 6/1/26.

Chick-fil-A Braker Lane

Outside

Braker Lane install
Braker land Inside Panel
Braker Lane Inside panel
Braker Lane Pole Light